







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Kitchen Remodeling: The Los Angeles Owner’s Guide
If you have a CGI kitchen and a cabinet face, drawer front, or hardware assembly that has failed, we stock CGI-compatible replacement components and install them throughout Los Angeles. A full CGI kitchen remodel in Los Angeles runs $16,520 to $53,100 depending on cabinet count, countertop material, and whether you’re replacing the layout or refreshing the existing footprint. Most owners discover a problem the same way: a drawer stops closing flush, a hinge pulls loose from its bore, or a door panel delaminates after years of steam and heat cycling from the range.
CGI cabinetry is built around specific hinge-boring patterns and drawer-box joinery. When a part fails, the fix is rarely just swapping a screw. The mount points, overlay measurements, and finish codes have to match, or the new part will bind, gap, or chip the adjacent door. Our crews handle this daily across neighborhoods from Echo Park to Woodland Hills, and we keep the most common failure parts on the truck.
Which CGI Models This Applies To

CGI has produced multiple cabinet lines over the years, and the parts are not universally interchangeable between series. The most common lines we see in Los Angeles kitchens are the full-overlay and inset door styles, which use different hinge cup depths and plate heights than standard overlay cabinets. Before ordering or installing anything, we confirm the hinge brand stamped on the original hardware, the door thickness (usually 3/4″ or 7/8″), and the reveal, meaning the gap between the door edge and the cabinet frame.
Here’s the compatibility gotcha most owners miss: two CGI cabinets can look identical from the outside but use different hinge mounting plates if one was built before roughly 2012 and the other after. Mixing those plates throws off the reveal by 2 to 3 millimeters, which sounds tiny until every door in the run sits crooked. For drawer boxes, the dovetail spacing and slide length matter just as much. We source OEM CGI parts where they’re still available and use quality aftermarket equivalents only when the OEM piece has been discontinued, which happens increasingly for older finish codes. Mason Remodeling Co Los Angeles is an independent service provider and is not affiliated with CGI. We also work with KraftMaid, Cambria, and Silestone products when the project calls for a wider refresh.
Styles & brands we work with







Signs Your CGI Kitchen Remodeling Is Failing
- Door won’t stay closed or pops open. The hinge’s self-close spring has lost tension, or the mounting plate screws have stripped from the particleboard frame. In humid months near the coast, the board swells and the screws walk out faster.
- Drawer slides grind or bind. The ball-bearing slides are full of cooking grease and dust, or the slide has bent from being overloaded. A bent slide will destroy the drawer box corners if left alone.
- Door panel delaminating or finish peeling. This is steam damage, almost always concentrated above a dishwasher or beside a wall oven. Once the thermofoil lifts, the substrate absorbs moisture and swells permanently.
- Hardware pulling out of the cabinet face. The hinge or drawer pull screws have stripped their bores. You can sometimes re-bore to a larger diameter, but repeated stripping means the face frame itself is compromised.
- Adjacent doors rubbing or slamming into each other. Hinges have drifted out of adjustment, or the cabinet face shifted as the house settled. Los Angeles homes on hillsides, places like Mount Washington or Baldwin Hills, see more of this than flatland houses do.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

A full CGI kitchen remodel in Los Angeles runs $16,520 to $53,100. Smaller scopes, like replacing all doors and drawer fronts while keeping the boxes, land in the lower third of that range. A full tear-out with new cabinets, counters, and hardware sits at the top. Here’s how the line items break down:
- Cabinet installation: $4,720 – $15,340
- Countertop installation: $2,360 – $7,670
- Kitchen island installation: $3,540 – $11,800
- Backsplash installation: $945 – $2,950
Every estimate is a written, line-item price before any work starts. No verbal ballpark that grows on the final bill. If we’re matching a single failed part rather than remodeling the whole kitchen, the labor drops accordingly, often to a few hundred dollars. All work carries our 365-Day Done Right Promise: if the installation is not right within a year of completion, we make it right at no cost to you.
DIY or Call Us?
For a loose hinge or a drawer that’s just sticky, you can tighten screws and clean slides safely. That’s maintenance, not repair. The line for DIY on CGI cabinetry gets crossed fast once you’re boring new hinge cups, re-mounting plates, or trying to match a discontinued finish. Mount holes drilled a fraction off center will throw the reveal and then you’re patching particleboard, which never holds the same way twice.
The cabinet swap itself isn’t dangerous the way spring or electrical work is, but the failure mode is expensive: a misaligned door scores its neighbor, a wrong-size drawer box chips the face frame, and now a $200 part has become a $700 replacement. If you’d rather have it matched and installed right the first time, call (213) 632-5711 and we’ll bring the replacement to your door with the technician’s name and photo sent before we arrive.
FAQs

Boxes and face frames typically survive 20 to 30 years in Los Angeles if they stay dry. Doors, drawer fronts, and hardware fail sooner, usually in the 10 to 15 year range, and faster in kitchens with heavy steam from cooking, dishwashers, or coastal moisture. Call (213) 632-5711 for an exact condition assessment, estimates are free.
Hinges and slides can often be replaced outright, and stripped screw holes can sometimes be re-bored one size up with a quality insert. Delaminated thermofoil doors are not repairable because the substrate has already swelled. Call (213) 632-5711 and we’ll tell you honestly which path makes sense for your cabinet.
A full kitchen remodel in Los Angeles runs 4 to 8 weeks from demolition to final walkthrough. Single-part replacements, if the part is in stock, are done the same day we’re on site. Call (213) 632-5711 for a written timeline before anything is scheduled.
We stock the most common CGI hinge plates, soft-close mechanisms, drawer slides, and mounting hardware in our Los Angeles trucks. Odd-size or discontinued finish parts are ordered direct and typically arrive within a week. Call (213) 632-5711 with your cabinet’s hinge brand and door measurement for a same-day stock check.
If your CGI kitchen has a failing part and you want it matched, priced, and installed without guessing, call (213) 632-5711 for a free estimate. Know who’s coming, know what it costs, know it’s guaranteed, everything else is just noise.
Written by Isaac Pruett, Owner, Mason Remodeling Co at Mason Remodeling Co Los Angeles, serving Los Angeles and nearby areas.


