







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Marina del Rey
A bathroom remodel in Marina del Rey typically runs $9,000 to $28,000, with smaller updates starting around $5,000 and full gut renovations or high-end condos reaching past $28,000 when custom tile, glass enclosures, and waterproofing upgrades are involved. You’ll get a written price before any work starts, and a live person answers when you call (213) 632-5711. We know this harbor front market because we work in it every week: the 1960s and 1970s condo buildings off Admiralty Way, the newer luxury towers along the water, and the older single-level homes on the former wetland flats east of Lincoln Boulevard.
What makes Marina del Rey different from inland neighborhoods is the salt. Not the salt in the air you notice, but the salt working its way into walls, fasteners, and framing over decades. That changes how we bid bathroom work here, and it’s why we never hand you a verbal figure and start swinging hammers. You get a written price, itemized, with allowances for what we know gets uncovered once the tile comes down.
Why Mason Remodeling Co Los Angeles Is Marina del Rey’s Preferred Bathroom Remodeling Company

This area has its own rhythm. Condo boards, HOA rules, parking restrictions for crews, service elevators, and delivery windows all shape how a remodel goes. Our project managers handle that coordination without leaning on you. Marina del Rey homeowners call us because the estimate holds, the crew shows up with name badges and uniforms, and when a surprise appears behind the wall, we price it in writing before we touch it. No verbal estimates that grow on the final bill.
Every crew member who steps through your door is background-checked and identity-verified under the Threshold Standard. You get the technician’s name and photo before the visit, and they’ll show a photo ID badge at the door. For homeowners who are often home alone, or have young kids, that verification matters. You’ll know exactly who is coming before you unlock the door.
Mason Remodeling has run as part of the Threshold Group family since 2004, and our Bathroom Remodeling team works to a simple standard: the work is right, the price stays true, and the crew treats your condo or house like it’s a neighbor’s home. If the work isn’t right within 365 days of completion, we come back and make it right at no cost to you. That’s the Done Right Promise, and it applies to every bathroom we touch in Marina del Rey.
Styles & brands we work with







One Day Bath Remodel in Marina del Rey
A One Day Bath Remodel in Marina del Rey is the fastest path to a usable, updated bathroom when the layout stays the same and the plumbing rough-in is sound. We replace the tub or shower base, walls, and fixtures in a single day, using acrylic or composite surround systems that resist the marine layer moisture better than old tile and grout. For a Marina del Rey condo or rental unit, this is the option that minimizes downtime and keeps HOA disruptions to a single workday. Expect to spend $4,500 to $12,000 depending on the size of the shower footprint and whether glass doors or a new pan are part of the scope.
When a One Day Remodel Makes Sense
If the bones are good and the bathroom is a straight swap, one day gets it done. We pull the old tub or shower, replace any rotted backer board, install the new surround and pan the same day, and reconnect your existing valve if it’s in usable shape. The acrylic systems we use don’t require grout, which means no long dry times and no future grout staining from Marina del Rey’s hard water.
What It Won’t Fix
If the subfloor under the old pan has gone soft from a slow leak, a one day remodel turns into a two or three day job once we cut out the rot and sister new framing. Same story if the drain line or p-trap is corroded. We say this up front, because telling you it’s always one day would be wrong. The honest answer is one day when the floor and framing check out, and we inspect before we schedule the day.
Bathroom Remodeling Contractor in Marina del Rey

A Bathroom Remodeling Contractor in Marina del Rey has to think differently than an inland remodeler, because what’s inside these 40, 50, and 60-year-old walls is usually not what the original drawings say. We’ve opened up bathrooms in the low-rise condos west of Via Marina and found galvanized pipe so corroded you could dent it with a thumb. We’ve found rebar rust inside concrete slabs where the vapor barrier failed decades ago. Isaac Pruett, who leads Mason Remodeling Co Los Angeles, trains every crew lead to photograph what’s inside the wall before closing it up, so you never pay for work you can’t see.
Full Gut Renovations and Small Condo Bath Updates
A full gut bathroom in Marina del Rey runs $9,000 to $28,000. A small bathroom remodel in a condo or guest bath typically lands between $5,000 and $12,000. The spread comes down to tile choices, glass enclosure upgrades, whether you’re moving the toilet or shower drain, and what the inspection uncovers. We write allowances for the known unknowns into the contract, so when rusted drain lines or failed waterproofing show up, there’s a number attached to the fix before we spend a dollar on it.
Walk-In Showers, Tub-to-Shower Conversions, and Vanities
Walk-in shower installation runs $4,500 to $12,000, and tub-to-shower conversion sits at $3,500 to $10,000. Bathroom vanity installation, including the cabinet, top, faucet, and plumbing hookup, lands between $800 and $3,000. Many Marina del Rey homeowners are dropping the tub entirely and going with a curbless or low-curb walk-in, which works well in the smaller condo bathrooms but requires careful waterproofing because these slabs don’t shed moisture like a raised wood subfloor does.
Trusted Brands We Service in Marina del Rey
We install and service cabinetry from KraftMaid and Wellborn, quartz and solid surfaces from Cambria and Silestone, and fixtures from Kohler, Moen, and Toto. What you choose depends on your building and your budget. For prefab and modular options, we’ve also worked with Abodu and Cover on accessory installations in Marina del Rey units where the HOA requires specific dimensions or off-site panelization. We keep the common parts and hardware for these systems in our LA stock, so a follow-up trim piece or a replacement hinge doesn’t leave your bathroom half-finished for two weeks.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Marina del Rey Homes
- Rusted galvanized supply lines and corroded p-traps. Decades of salt-laden air and high water table conditions inside slab foundations accelerate corrosion on older steel pipe. We budget for re-pipes in any 1960s or 1970s bathroom where the original plumbing is still in place.
- Failed waterproofing behind 1960s tile. The marine layer keeps these walls damp for months at a time, and once the original mortar bed and felt paper give out, the framing behind the tile starts to rot. By the time you see cracked grout or a loose tile, the damage underneath has usually been building for years.
- Non-marine-grade fasteners and hinges rusting through. Standard steel hardware fails fast near the harbor. We spec stainless and marine-grade fasteners on every Marina del Rey bathroom, because the alternative is rust streaks on a brand new vanity within two years.
- HOA and code requirements catching unpermitted work. Marina del Rey inspectors flag unpermitted bathroom remodels at resale, especially where plumbing was moved or electrical was altered. If you’re selling a condo, that’s a problem that comes out of your closing. We handle the permit pull so it’s not your headache.
Pricing for Bathroom Remodeling in Marina del Rey, CA
Here’s what you’re actually looking at, in real numbers, for Marina del Rey work.
| Service | Typical Range in Marina del Rey |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Bathroom Vanity Installation | $800 – $3,000 |
The biggest cost drivers in Marina del Rey are what’s inside the walls: galvanized re-pipes, rotted subfloor replacement, and waterproofing upgrades that code requires once the wall is open. Tile, fixtures, and glass will swing the finish price, but the hidden work is what separates a $9,000 bathroom from a $22,000 one. Call (213) 632-5711 for a free written estimate. You’ll get real numbers, not a verbal range that floats after demolition starts.
We Also Serve Cities Near Marina del Rey
Our crews also cover Venice, Playa del Rey, Culver City, and El Segundo. The same written pricing, the same Threshold Verified crews, the same 365-Day Done Right Promise. If you’re in a neighboring city, give us a call at (213) 632-5711 and we’ll get you scheduled for a free estimate. Marina del Rey is our core harbor market, but the coast and the inland edge are familiar territory.
Serving Marina del Rey, CA - Our Local Coverage Area
We’re based in the Marina del Rey area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs About Bathroom Remodeling in Marina del Rey
Because the hot and cold supply lines behind the wall are often original galvanized steel from the 1960s or 1970s, and decades of salt air plus the high water table near the harbor have corroded them from the inside out. A faucet can look perfectly fine outside while the pipe behind it is down to a pinhole. Once we open the wall, if we see galvanized, we always show you what we found and quote a re-pipe before covering anything back up. Call (213) 632-5711 and we’ll tell you what to expect in your building specifically, free.
Typically three things: grounding and GFCI protection for the bathroom circuits, ventilation that meets the current mechanical code requirement, and waterproofing details under tile that the building code has tightened significantly since the 1970s. In buildings with shared walls, there’s also often a fire-blocking requirement at shared stud bays. We write these as allowances in the contract so you know the range before demolition, and we confirm the exact upgrade once the wall is open and the inspector can see what’s there.
The marine layer keeps bathroom walls damp for months at a time, especially in buildings without central air conditioning to pull moisture out. That means we lean on surface-applied waterproofing membranes like Schluter Kerdi, or a full shower pan membrane, rather than relying on grout and tile alone. Grout is not waterproof, and in this microclimate it stays wet longer, which is exactly why so many 1970s Marina del Rey bathrooms have hidden rot behind beautiful original tile. We spec waterproofing systems that keep water from ever reaching the framing.
For fixture swaps in the same location, you typically don’t need a permit, provided no plumbing drains, water lines, or electrical circuits are altered. But if you’re moving a toilet, shower, or sink, or adding a circuit, you do need one. Marina del Rey is under LA County jurisdiction with city-specific enforcement, and inspectors will flag unpermitted plumbing or electrical work at resale. We pull permits when the scope requires them, and we don’t pressure you to skip the process to save a few hundred dollars. Call (213) 632-5711 and we’ll tell you if your scope triggers a permit, no obligation.
Three reasons. First, labor and material logistics near the harbor cost more, full stop. Second, the older housing stock means we’re routinely opening walls to find corroded plumbing, failed waterproofing, and framing that needs repair before new tile goes up. Third, many Marina del Rey jobs are in condo buildings with HOA work windows, service elevator scheduling, and parking constraints that add scheduling days to the job. That’s why our $9,000 to $28,000 range is honest for this area, and why we put it in writing before we start, not after we’re mid-demo. Call (213) 632-5711 for a free, itemized estimate you can actually compare.
Written by Isaac Pruett, Owner at Mason Remodeling Co Los Angeles, serving Marina del Rey and the surrounding beach cities since 2004.










