A Mason company - serving Los Angeles, CA
A new rear addition with a vaulted beamed ceiling and tall windows

CGI Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Los Angeles
A second-story addition that matches the existing roofline
A wide opening with a new beam where the kitchen wall was removed
A freestanding soaking tub in a remodeled primary bathroom
A whole-home remodel with the living, dining and kitchen areas opened up
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A stone counter, tile backsplash and open shelf after a kitchen remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

CGI Home Additions & ADU: The Los Angeles Owner’s Guide

CGI home additions and ADU construction in Los Angeles typically runs $53,100 to $153,400 installed, depending on square footage, foundation work, and whether you’re building up or out. We carry and install CGI-compatible structural components, framing packages, and finish materials used across Los Angeles room additions and accessory dwelling units. Most homeowners call us after noticing visible settling, cracked drywall at the new-to-old wall junction, or water staining where the addition ties into the original roofline.

Call (213) 632-5711

Isaac Pruett spent years watching how Los Angeles additions fail at the seams; the tie-in points, the roofline transitions, the foundation joints. That’s where the money goes, and that’s where the cheap bids hide. If your CGI home addition or ADU is showing stress at those connection points, you’re not imagining it, and you’re not alone.

Key Takeaways:

  • Installed costs for Los Angeles home additions using CGI-compatible materials: $53,100 – $153,400
  • ADU construction runs $106,200 – $259,600, with garage conversions at $35,400 – $94,400
  • We deliver a written price before any work starts, every time
  • Every crew member arrives with a photo ID badge and is introduced by name before the visit
  • Our work carries the 365-Day Done Right Promise on general contracting and whole-home remodels

Which CGI Models This Applies To

A garage converted into a guest room and home office

CGI home additions and ADU components in Los Angeles tend to split into two camps: load-bearing structural framing packages and non-structural finish systems. The structural side includes engineered lumber, floor trusses, and roof members sized for California seismic and wind loads. The finish side covers siding, trim profiles, and interior panel systems that align with CGI’s residential series lines.

Before you buy anything, check the stamp on the existing components. CGI products carry a manufacturer’s mark on the edge or end grain of structural members; finish materials usually have a printed label on the back side or on the original packaging. Measure the actual dimensions, not just the nominal size. A 2×6 that’s actually 1.5 inches by 5.5 inches versus one milled at 1.75 by 5.75 matters at the joint. In Los Angeles, we see a lot of owners order by habit (“it’s a standard 2×6, right?”) and end up with a mismatch at the load point. Don’t guess, measure.

On the OEM versus aftermarket question: for structural CGI components, use OEM or a documented equivalent with matching span and load ratings. For non-structural trim and paneling, quality aftermarket pieces from brands we work with like KraftMaid, Cambria, and Silestone often cost less and hold up just as well in our dry Los Angeles climate. We’re an independent service provider, not affiliated with CGI, so our recommendation comes from what we see hold up on actual Los Angeles jobsites, not from a manufacturer’s catalog.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your CGI Home Additions & ADU Is Failing

Home additions and ADUs fail predictably in Los Angeles, and the signs usually show up at the seam between old and new construction. Here’s what we see on service calls across the city:

  • Diagonal cracks at interior corners where the addition meets the original house. This usually means differential settling; the new foundation is moving at a different rate than the original slab, which is common in Los Angeles’s expansive and shifting soils.
  • Gapping between the addition’s roofline and the original roof, especially after a rainy season. Water gets into the gap, swells the framing, and worsens the separation. Left alone, this turns into a full roof tie-in failure within a few seasons.
  • Doors and windows in the addition binding or sticking in their frames. That’s the framing racking out of square, typically from moisture cycling or soil movement under the footings. It’s not a paint problem, it’s a structural one.
  • Visible water staining along the base of the addition or ADU’s exterior walls. This indicates failed flashing or improper elevation at the foundation. In Los Angeles, even our limited rain events cause major damage when water has a path.
  • Squeaking or bouncing floors in the new section while the original floors stay solid. This points to undersized or improperly spaced floor joists or a failed connection at the ledger board.

Any one of these deserves a close look before you pour more money into cosmetic fixes. The underlying issue rarely fixes itself.

Replacement Cost & What’s Included

A finished backyard cottage with a small covered porch

A full CGI home addition in Los Angeles sits between $53,100 and $153,400, with ADU construction running $106,200 to $259,600 and garage conversions at $35,400 to $94,400. The range comes down to square footage, how much foundation work the soil requires, whether we’re cutting into the existing roof or tying in below the eave line, and what level of finish you choose.

When we price a home additions & ADU project in Los Angeles, the written quote includes all structural components, tie-in hardware, flashing and weatherproofing at the junction, rough and finish carpentry, and the labor to get it done. No verbal estimate that grows on the final bill; what’s on the page is what you pay. Every project ships with our 365-Day Done Right Promise: if the work isn’t right within a year of completion, we make it right at no cost to you. That’s 365 days from the completion date, stated plainly on your written guarantee.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

DIY or Call Us?

What you can safely do yourself: inspect the visible joints, flashing, and foundation edges for cracks and water intrusion. Take photos. Watch how water moves around the addition during the next rain. Read your original plans, if you have them, and compare what’s on paper to what’s built. That’s it.

What you shouldn’t do: remove any structural component, open up a load-bearing wall, adjust foundation supports, or cut into your existing roof. This is not a patch-and-paint situation. Framing and foundation work on Los Angeles additions involves concentrated loads, and a failure while you’re working on it can be catastrophic. Even licensed contractors get hurt on tie-in work; this is not a setup for a casual weekend project. If you see signs of structural movement, call (213) 632-5711 and we’ll send someone who will show you exactly who’s coming, with a name and photo before the visit. Know who’s coming, know what it costs, know it’s guaranteed, everything else is just noise.

FAQs

A single-story rear room addition with tall windows and a new patio

Ready to Fix Your Home Addition or ADU?

You don’t have to live with a cracking addition, a leaking tie-in, or a floor that bounces when you walk across it. We’ll send a background-checked, uniformed technician with a photo ID badge, and you’ll have their name and photo before they arrive. You’ll get a written price before any work starts, with a written guarantee on the back end. Call (213) 632-5711 for your free estimate, and let’s get your home addition or ADU back to doing what it’s supposed to do.

Written by Isaac Pruett, Owner, Mason Remodeling Co at Mason Remodeling Co Los Angeles, serving Los Angeles and nearby areas.

Getting started with Mason in Los Angeles

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Los Angeles team

A local crew that works across Los Angeles and the towns around it, to the same written standard as every Mason location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Los Angeles? Licensed & insured · Written quotes before work starts response · free estimates
Call (213) 632-5711
Local Service Coverage

Request a Free Estimate in Los Angeles

Tell us what you need - Mason Remodeling Co Los Angeles responds fast. No obligation.

By submitting this form, you agree to our Privacy Policy and agree to be contacted by call, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch