Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Quikrete Bathroom Remodeling: The Los Angeles Owner’s Guide
A full Quikrete-based bathroom remodel in Los Angeles typically runs $10,620 to $33,040 installed, and the materials are usually in hand within 3 to 5 business days once we confirm the specs. Most homeowners don’t call us about a Quikrete product in isolation. They call because a shower pan cracked along the slope line, or the surface bonding cement has delaminated from a curb, or a patch job they did two years ago is now wicking water into the subfloor. By the time we’re on the phone, the failure is usually visible and the question is whether the surrounding tile, waterproofing, and framing can be saved. In a lot of Los Angeles homes that answer is yes, if you catch it before the water does real structural damage.
Mason Remodeling Co Los Angeles is an independent contractor, not affiliated with Quikrete. We work with Quikrete products daily: floor patch, self-leveling underlayment, mortar beds, surface bonding cement, and the acrylic fortifiers that get mixed in. We know how these materials behave in Los Angeles’s dry-and-then-suddenly-rainy climate, and we know what fails first when a bathroom remodel wasn’t prepped right the first time.
Key takeaways:
- Installed cost range: $10,620 – $33,040 for a full Quikrete-based bathroom remodel in Los Angeles.
- What fails first: shower pans, curb bonding, and thin patches over wood subfloor.
- Our process: written price before any work starts, name and photo of your technician before arrival, and a 365-Day Done Right Promise in writing.
- Call (213) 632-5711 for a free estimate. A live person answers, 24/7.
Which Quikrete Models This Applies To

Quikrete doesn’t make a single “bathroom remodeling” product. It makes a family of cementitious products that get layered together: Floor Mud / Deck Mud (4:1 or 5:1 sand-to-cement ratio) for sloped shower pans, Self-Leveling Underlayment for flattening slab and wood subfloor before tile, Surface Bonding Cement for skim-coating and repairing parapet or curb surfaces, and Concrete Bonding Adhesive for adhering new cement to old concrete. The gotcha: not every Quikrete product belongs in a wet area. Self-leveling underlayment, for example, is not rated for use as a final wear surface, and some versions require a primer before application. Skip the primer and you get a floor that sounds hollow and eventually cracks loose from the slab.
Here’s the compatibility reality we see in Los Angeles bathrooms every month: a homeowner uses standard Quikrete Concrete Mix instead of Floor Mud for a shower pan, then wonders why the pan doesn’t slope properly and holds water at the drain. Concrete Mix has larger aggregate and won’t pack tight enough for the precise 1/4-inch-per-foot fall a shower needs to drain. We keep both on the truck and we check the slope with a two-foot level before we ever set tile. That’s the difference between a pan that drains for 20 years and one that puddles in six months.
When evaluating a remodel, we also look at what’s already in place. If the existing mortar bed is sound and only the top layer failed, we can often save it. If the pan was poured at the wrong thickness (under 1-1/4 inches at the drain), we demo it and pour a new one. That decision drives the price more than any other single factor.
Styles & brands we work with







Signs Your Quikrete Bathroom Remodeling Is Failing
- Water pools in the corner of the shower after every use. The sloped mortar bed underneath has settled or was never pitched correctly. Water should move to the drain within a minute or two after the water stops running.
- Grout lines along the floor stay dark or damp for hours. A dark line that doesn’t dry means water is saturating the mud bed below, not just the surface. This is the first sign of a failing pan.
- Loose or cracked tile at the curb or along the shower entry. The surface bonding cement has sheared from the substrate. Curb corners are the most common failure point because they flex with every step in and out.
- A hollow sound when you tap the shower floor. The mortar bed has debonded from the substrate. A solid pan should thud; a failed one echoes. That void is where tiles crack next.
- Musty smell that comes through the wall behind the shower valve. Water has escaped the waterproofing layer and is wicking into the framing. In Los Angeles, especially in older Encino and Sherman Oaks bungalows, this often gets dismissed as “old bathroom smell.” It’s not.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

In Los Angeles, expect a Quikrete-based bathroom remodel to land between $10,620 and $33,040, installed. The spread depends on what’s being rebuilt. Replacing a shower pan and the lower course of tile runs on the lower end. A full gut-and-rebuild of the bathroom, including a new mortar bed, self-leveling underlayment over the existing subfloor, curb reconstruction, waterproofing, tile, fixtures, and a new vanity, drives the number up. A small bathroom remodel in Los Angeles, which often covers a compact hall bath or a powder room refresh, runs $5,900 to $14,160.
What’s included in our number? Materials, labor, demolition of the failed surfaces, haul-away of debris, the written line-item price, and our 365-Day Done Right Promise. If the work fails within 365 days from the completion date, we return and make it right at no charge. No trip fee, no debate, no fine print hiding behind a phone menu. We also provide a free second visit if a repair or installation fails. That’s in writing on every single project.
The price you get on the first visit is the price you pay. We don’t grow the invoice at the end.
DIY or Call Us?
What can you safely check yourself? Look at the visible signs: where the water pools, whether grout stays dark, whether the curb tiles wiggle. Take photos and note when you first noticed the issue. That helps us scope the job before we even get there. What you shouldn’t try to DIY: tear out and re-pour a shower pan. A mortar bed carries tile, handles daily foot traffic, and is the first line of defense between your shower and your subfloor. Getting the slope wrong, using the wrong Quikrete product, or skipping the waterproofing layer is how bathrooms in Los Angeles end up with dry rot running under the wall plate.
This isn’t a plumbing replacement. This is 600 pounds of mortar and tile sitting over your floor joists, and it has to be built to shed water for two decades. If you’re even mildly unsure, call us first. We’ll send someone who knows exactly what they’re looking at, and the estimate is free. Reach us at (213) 632-5711.
FAQs

A properly built Quikrete mortar bed and pan lasts 25 to 40 years, sometimes longer, in a Los Angeles bathroom. The failure you see in year 6 is almost always an installation problem, not a material problem: wrong slope, wrong product, or skipped waterproofing.
Sometimes. If the pan is cracked but still structurally sound and the slope is correct, we can often patch and re-waterproof the surface. If the crack runs to the drain or the bed has debonded, a patch won’t hold. We’ll tell you which one you have during the free estimate. Call (213) 632-5711 to have us look.
A full bathroom remodel runs 2 to 4 weeks from first hammer to final inspection, depending on scope and material lead times. A shower pan replacement alone can be done in about 3 to 5 working days once materials arrive.
Yes. Our crews carry Quikrete Floor Mud, Self-Leveling Underlayment, Surface Bonding Cement, Concrete Bonding Adhesive, and the associated primers. That means fewer trips, fewer surprises, and a faster start once we’re on site. We also work with KraftMaid cabinetry, Cambria quartz, and Silestone surfaces if your remodel scope extends beyond the tile work.
Written by Isaac Pruett, Owner, Mason Remodeling Co at Mason Remodeling Co Los Angeles, serving Los Angeles and nearby areas.